I have a 1000 kVA Transformer(11kV/0.415kV) and a APFC panel
of 400 kVAR(LT).Now if i want to remove the LT APFC panel
and install a HT(11kV) APFC panel on the HT side is the HT
APFC panel will work same as the LT APFC panel(improve the
power factor),if yes what will be rating of the HT APFC
panel?what is the formula to calculate HT APFC panel rating???
Answer Posted / kathiravan
Since the PF is corrected "before" the bank is connected
(EX:A--------B---------------C----------------D-----------E.
Suppose If the bank is connected the location @"C",the PF will be corrected from location A to C only,where as location C to E will not be effected by the installation of location C)there wont be much effected weather to locate capacitor either primary or secondary of the transformer.Rating of the capacitor must be the respect of HV/LV supply voltage.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How time response of the system is divided?
How shall i select the value of capacitor or inductor in a system?
It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.
What Normal(Tangent) towers and Tension(Cut-point) Towers?
wat is d diffr btw shunt coil and trip coil in VCB?
Explain forward resistance, static resistance and dynamic resistance of a pn junction diode.
how r charge carriers produced
sir vizag steel ka junior trainee ka paper kitne number ka ayega
why tertiary winding is used in transformer with diagram?
What is meant by a stray loss of a induction motor??? What is the equation to find it
hi this is hema, r there any books in particular for the preparation of the APPSC-A.E.E(electrical), if so please mail me the names ... thank u .
at meter room 50 hrc switch installed,but there are not get earthing proper,so what happen?and 11kv transformer out put going in to hrc main 400a three nog each? so earthing is require for all switch? (some customer made earthing at there home.)
Why we use circular(Stepped) cross section in transformer core?
can someone explain that how the speed of the protection system affects the fault level calculation?
What is pole of the system?