How many number of bricks required for 1 cum & how much mortar
quantity require for 1 cum
Answer Posted / sobhanbabu
theritically 500 bricks and practically 450 to 480.here
practically means type of skilled mason and labor.it needs
58 kg cement to construct a cumec of brick work of size
19*9*9cm
| Is This Answer Correct ? | 13 Yes | 11 No |
Post New Answer View All Answers
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
What is the Unit weight of coarse sand (F.M- 2.20) ?????
What is the difference between chamfer and fillet?
What will you do if you encounter problems like accidents?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What is an object snap mode?
Tell me about triple point of water.
What is change order request?
what is the types of surveying?which type of survey carrying for type of work?
Gidc technical que paper
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)