1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / sk
From above answer we realise the demerits of reservation.
1-add
2-deduct
3-multiply
4-divide
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Sir how to find cutting length for footing steel bars in the shape of "u"
what is a well
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Define absolute co-ordinates?
What are the composition of a landfill?
how to estimate material requirement for an area of house in square feet?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
How do you change a dimension value in solidsworks?
can any one explain bar bending schedule of bems and columns and slabs ??
For Wet Mix Mecadam design what is Optimum moisture content
Where will be the maximum bending moment in a TEE Beam?
what is flashing?
What is structural frames or systems?
why the openings of sieves are square io size?