1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / sk
From above answer we realise the demerits of reservation.
1-add
2-deduct
3-multiply
4-divide
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
.5Ast
what is the use of beam end forces while using a staad ? wha they are show
What is kn measurement?
How do you calculate the power of centrifugal pump?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
How to find out kg per Sft ?
How to arrive dry volume of concrete (1.52 to 1.57) ?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
what is stressing
detailed calculation of the amount of cement used?
How to take labor charges for construction of 1cum of concrete?
what are the five benefits of using standard terminology in the measurement process?