define jig and fixure?what is diference between jig and
fixure?
Answer Posted / onesimo mutembwa
Answer number 6 above is the best answer.It encompasses the
answer from both fitter,machinist and boilermaker
perspectives.When drilling,you use a drilling jig for
repetitive and you use a fixture to hold the jig on the
drilling machine bed.When fabricating you use a jig to do
sub-assemblies.A fabricating jig can AT TIMES act as both
jig and fixture since you can both assemble and weld in the
jig
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how to calculate the size and weight of induced draft axial fan impeller
Pl. brief me about geometrical test & positional accuracy of machine tool.
Quantities like pressure, temperature, density, viscosity, etc. Are independent of mass. What are these called ?
please send me samples of tech. & aptitude tests
WHAT IS THE TOTAL HEAT RATE OF PLANT AND WHAT IS THE HEAT RATE OF BOILER?
Sir, In the current session I am attending the Junior Engineer Exam in Grade II for Mechanical Engineering. If it possible. Please sent the Past Exams Question on my mail. It is so useful use to me.
How to check temperature controller?
What are the requirements of a good fuel?
what is the use of choper motor in pyrometer ?
what do you mean by volvo ?
Explain the difference between pipe and a tube.
What type of pump is commonly used is feed water system in auxiliary boiler?
you consider yourself suitable for the post in EIL?
Explain nuclear reactor?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb