what is periode of deshuttering for different area of slab
Answer Posted / harbans singh
It is also depends on whether in cold deshuttering required
more time.
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
how many BSCs can i connect to the HUAWEI MSC
What is the difference between 53 grade and 43 grade cement
Define What is a kip?
for pretensioning which will yield first and same for post tensioning?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
how much cement and sand required for 1cum rr masonry
how many material required for brickbat water proofing of toilets.
Why reinforcement done in shorter span in two way slabs
Explain the different types of building contracts?
what is the 0 value in quantity surveying
What do you understand by “preset” during the installation process of bridge bearings?