Can it be configured in such a way that the external
requisitions can also be taken into account while MRP runs
in consumption-based planning if VB is selected as MRP type?
Answer Posted / shriya
Yes you can do it based on the MRP2 tab for materila master
oyu need to given you MRP type as VB and in Mrp2 set
automatic reorder point tab . Now run MD02 and MD04
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Can you post physical inventory document for a new material in sap or movement type 701 in sap mm?
What is the source of error "not allowed" in case of custom movement type creation?
What is batch information cockpit?
Why gr blocked stock is necessary in sap mm?
Explain what is cbp? What is the difference between cbp and mrp?
You want to perform quota arrangement. What steps would you take?
What are the various steps of the mm cycle?
How is the vendor return processed without a purchase order reference?
What is an 'mrp list'?
What is the use of ‘material status’?
What is the subcontracting cycle?
What is the differences between release procedure with classification and release procedure without classification? In which business scenario we use them?
What is the procedure to make the source list automatically appear in material master as default if maintained at plant level using ome5?
What are the data in the mm module that are maintained at the company code level?
How do you change characteristic?