Answer Posted / sonia
Target costs is the expected cost which is going to occurred
when good manufactured.
Total target costs = Fixed plan costs + Variable plan costs
X Operating rate
Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What is the difference between "costing based" (cb) and "account based" (ab) co-pa ?
While posting transaction, can we give cost centre / production order at time?
What are the prerequisites in order to customize a document in sap?
What are the issues you faced after the implementation project in go-live?
What is a document type? : fi- general ledger
WHAT ARE THE STEPS INVOLVED WHILE DATA UP LODGING IN LSMW
Why doesn’t the system allow you to change the tax category in a version? : fi- general ledger
Explain what is posting key and what does it control?
Explain the organizational assignment in the pa module? : co-pa
How many chart of accounts can be attached to a company code?
What is direct activity allocation? : co- cost center accounting
Please provide me with configuration documents of USER EXIT' Thanks Naresh
error msg no-f.5071 in down payment. what would be the entry for clearing this open items..in f-44..?
What are the two uses of blocking an account? : fi- general ledger master data
What is a 'year shift' in sap calendar?