a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?
Regards
Answer Posted / jaikumar
If Cutting length of ring is 250-40*2=170
400-40*2=320
Total =170+320*2=980mm+hook calculate 10*8+80
We elongation on the 8mm rod
minus =980+96+96=1172-5*8
1172-40=1132 mm
| Is This Answer Correct ? | 25 Yes | 8 No |
Post New Answer View All Answers
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
please briefly explain calculating or estimating steel quantity for a RCC column?
Why are the bolts that hold steel rails together in oval holes?
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
During reclamation how can the occurrence of mud waves can be rectified?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
How to arrive dry volume of concrete (1.52 to 1.57) ?
What do we mean by partial moment release ??
Define What is Civil Engineering?
Critical Path Method is...
how calucate cement sand ratio for plstering
What should be the standard roof height like to be?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level