Answer Posted / sandy
i think answer is
sigma f.s.- sigma b.s.= Last r.l.- first r.l.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What are the different types of civil engineering?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
What is Architect-Prepared Contract?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
What you understand by richter scale?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
What is soil enforcement?
what is the composition of good brick ?
pls give me ans to ACT formula cube testing porpuse
Explain the different types of building contracts?
Civil engineering material testing Standard results
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
Would you cause a 55-gallon drum of water to weigh more by climbing in?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai