Answer Posted / md simab akhtar
first thing max man power should b available 4 construction and cost should b low and durability should b good
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
I need to constructive work in amaraj batteries
What is the use of extend command?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
detailed calculation of the amount of cement used?
how to do sudoko puzaals?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What difference comes in constructing of house and a housing complex like society
may i know the detailed description of cutting length
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
What do you meant by gui?
how to calculate the density for high density concrete ? or is it same as the density of RC?
Explain how you can turn off the display for dimension in CAD?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
Why you are leaving present job?