how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / m
ratio is 1:2:4
1+2+4=7
100cft concrete
100*1.54=
then divide by 7
then divide by 1.25 you wil have cement bag
| Is This Answer Correct ? | 71 Yes | 29 No |
Post New Answer View All Answers
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
how much of the strength comes from post-production curing
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
Define What is the origin of name Railway Sleepers?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
What is alternate bid?
what is the meaning of degreasing of the euipment or line.
water leak detection system question & answer
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
How to find out slope footing concrete
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
What is the minimum size of the particles of silt soil?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com