what is pf. how to calculate capacitor bank value to
maintain unity pf.
Answer Posted / shashikant
CALCULATIONS AND TABLES
Calculation and selection of required capacitor rating
Qc = P * {tan [acos (pf1)] - tan [ acos (pf2)]}
Qc = required capacitor output (kVAr)
pf1 = actual power factor
pf2 = target power factor
P = real power (kW)
The table below shows the values for typical power factors
in accordance with the above formula
TARGET POWER FACTOR
0.7 0.75 0.8 0.85 0.9 0.92 0.94 0.96 0.98 1
Actual Power Factor
0,40 1.27 1.41 1.54 1.67 1.81 1.87 1.93 2 2.09 2.29
0,45 0.96 1.1 1.23 1.36 1.5 1.56 1.62 1.69 1.78 1.98
0.50 0.71 0.85 0.98 1.11 1.25 1.31 1.37 1.44 1.53 1.73
0,55 0.5 0.64 0.77 0.9 1.03 1.09 1.16 1.23 1.32 1.52
0,60 0.31 0.45 0.58 0.71 0.85 0.91 0.97 1.04 1.13 1.33
0,65 0.15 0.29 0.42 0.55 0.68 0.74 0.81 0.88 0.97 1.17
0,70 0 0.14 0.27 0.4 0.54 0.59 0.66 0.73 0.82 1.02
0.75 0 0.13 0.26 0.4 0.46 0.52 0.59 0.68 0.88
0,80 0 0.13 0.27 0.32 0.39 0.46 0.55 0.75
0.85 0 0.14 0.19 0.26 0.33 0.42 0.62
0,90 0 0.06 0.12 0.19 0.28 0.48
The required capacitor output may be calculated as follows:
select the factor (matching point of actual and target
power factor) k
calculate the required capacitor rating with the formula:
Qc = k * P
Example:
actual power factor = 0.70, target power factor = 0.96,
real power = P = 500kW,
Qc = k * P = 0.73 * 500kW = 365 kVAR
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is the rate of WCT on the Electrical Contracts comprising of DG Sets and Civil Works in Delhi ?
how to calculate the surge level of surge suppressors related to the SF6 cicuit breakers?
What are your personal skills and abilities for such a Master Course and your possible preparation to undertake this course?
What is the maximum operating temperature for a thermoplastic insulated cable?
can we do the star delta connection of capacitor for 3- phase motor starter.
i need project topics along with circuit diagram in the electrical and electronics engg and also some websites regarding projets.
What is Tachometer used to measure?
In how we connect watt meter for open & short circuit test of a single phase transformer.
1.dg on load alarm/stop alarm... 2.dg on load. piu alarm alarm kaise chek krte hai
Why is negative feedback invariably preferred in closed loop system?
1) What are your personal strength? 2) What are your personal areas of improvement? 3) What are your expectations from from a particular job? 4) what are your carrier objectives?
what is the importance of Partial Dischage test for Electrical Equipments
Can u tell me design of switch yard
what do u understand about FACTS? how they are useful?
We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?