What"s the brick size we use in construction?1.190x90x90
2.230x100x75 Which one "s correct?
Answer Posted / nisheeta devarapalli
20*10*10 cm
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
silt%= silt volume/ silt+sand volume is this right?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
What are the different methods for drawing an arc?
What is the difference between engineering stress and true stress?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
What is a projection line?
what values & beliefs have guided you in your career path
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
how to caluclate sienerge qty in construction in ap
How many lbs are there in a yard?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream