What are the issues that you have faced while moving your project from the Test Environment to the Production Environment?
Answer Posted / ashish
The sequence generator values test environment was migrated to Production environment. As part of migration, the sequence generator should also be reset as part of Production existing values.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
SOURCE DATA IS DISPLAY IN THIS FORMATE IN TARGET . WHAT BUSINESS LOGIC WE CAN APPLY. source table target table ------------ ------------ c1 c2 c3 c1 c2 c3 -- -- -- -- -- -- 1 A J 1 2 B K 2 A 3 C L 3 B J 4 D M 4 C K 5 E N 5 E L F M N
I am not able to connect to the domain with the client although all services and databases are up and there is no network issue?
What are the main issues while working with flat files as source and as targets ?
generate date / time dimension in informatica
Name at least 5 different types of transformations used in mapping design and state the use of each.?
What is the difference between informatics 7x and 8x and what is latest version?
What are the tuning techniques you applied during your last project
What is meant by a domain?
Explain scd type 3 through mapping.
What is the surrogate key?
How do you promote a non-reusable transformation to reusable transformation?
HOW TO PROCESS THE ROWS FROM JOINER AND EXPRESSION TRANSFORAMTION TO SORTER TRANSFORMATION
if i hv 6 table as source table but can i make 12 as a dim table and 6 as fact table belongs to that src table.
Difference between Data and Index Caches?
Define the various join types of joiner transformation?