Why we do design mix of concrete when there is nominal
method using the IS-Code available ?
Answer Posted / rakesh kumar mallik
By design mix of concrete we can achieve more workable
concrete without hampering the strength of concrete which is
not possible in nominal mix of concrete.
By design mix we have have control over the quantity of
material,water cement ratio to achieve the required strength.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
what is the difference between np2 and np3 concrete mix
What Are The Steps Involved In The Concreting Process, Explain?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
what is project?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
what is tension & compression of steel bending.
What is difference between combin footing & rapt footing
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?