Why we do design mix of concrete when there is nominal
method using the IS-Code available ?
Answer Posted / rakesh kumar mallik
By design mix of concrete we can achieve more workable
concrete without hampering the strength of concrete which is
not possible in nominal mix of concrete.
By design mix we have have control over the quantity of
material,water cement ratio to achieve the required strength.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How do you measure water flowing through 300mm diameter pipes?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
how we calculate the grade of the Bituminous materials.?????
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
What is the largest concrete dam in the world?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
How to calculate plastering for elevated water storage tank
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
How to do base isolation for RC framed structure using ETABS software?
natucher of concrete &type of concrete?
about higyway engineering
What is meant by autocad?
what is the productivity in aluminium shuttering per day
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??