what is the rating of power
generation in india?
Answer Posted / ranjan samanta
11kv to 21kv.
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
What is the reason for using a GE G101 MCB in place of an EP102 MCB if both are capable of AC circuit protection?
How to Make relay co ordination chart for a Electrical power distribution of a plant
how to calculate the earth mat design in 132 kv substation yard ????
What are the types of class b amplifier?
Trafo ratio is 11kV/6.6kv,Vector group is YND11. What will be the effect if secondary is used for earthed system.
how to work droop ct in generating station
Can any one provide the inspection procedure of MIMIC for VFD panel? Details: If someone wants to have a mimic in the VFD panel what are inputs considered for the mimic(like on,off,trip) whether we are able to add speed variation in the mimic(if so how can we get) and what are the parameters to be checked in the MIMIC during inspection?
how to enter inverter parameter? without manaual?
what is meant by rotating magnetic filed
why ct ,cvt should be stored in a vertical position?
Whether should be the oil level in OCTC transfomer? It should be upto winding immersed completely or should be upto tap changer s/w? How it will affect the performance of the transformer. Rating may be 33KVA
What are the two segments of nyquist contour.
i need some project topics along with circuit diagram in the electrical adnd electronics engg and also give ome website regarding projects.my mail id is thenmozhi2k7@gmail.com .please help me.
Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.
During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.