can any body tell me what is standard cost estimate with
out quantity structure,and what is the configuration
settings for that?
Answer Posted / john
A cost estimate without qty structure is the KKPAN, its a
manual cost estimate and does not use the work center
routing scenarios that exist with a qty structure.
the config settings, are cost component structure the
costing variant, and possibly the costing sheet if that was
required.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is difference between primary distribution and secondry distribution of cost in a cost centre
If you want to learn Free Sap FI Course online join "SAP Fi Free online Course group" on FB
Where do you attach the check payment form?
How do you configure that the results of the standard cost estimate are updated in other fields other than the standard price?
Where can I get the mysap business suite on linux?
What are characteristics and value fields?
1.how can we convert VAT Return Filing in SAP? 2.How can we configure Form "C" report in SAP ?
How do you maintain currency in sap?
if company is incorporated on apr25, how to create a fiscal year with period 1 starting from apr25 instead of apr1? (fiscal year is apr-mar)
How to configure Input tax while processing Third party sale (MIRO)-errors coming M8889, ME045, ME038?
What are statistical key figures in co?
How do we create tasks? What is the difference between task and change request?
Explain open sql vs native sql?
Where do you assign activity type in cost centers? : co- cost center accounting
What is a credit memo? : fi- accounts payable