can any body tell me what is standard cost estimate with
out quantity structure,and what is the configuration
settings for that?
Answer Posted / john
A cost estimate without qty structure is the KKPAN, its a
manual cost estimate and does not use the work center
routing scenarios that exist with a qty structure.
the config settings, are cost component structure the
costing variant, and possibly the costing sheet if that was
required.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How the system will know that april is your first posting period?
Explain about asset master?
currently i am recruited in rollout project my parent company is singapore and now we are doing rollout in malaysia.so could any one please tell me what are the neccesaary steps
What is Unit Testing & Integration Testing. Explain with example considering FICO module.
What is a noted item? : fi- accounts payable
What is "extended star schema" and how did it emerge?
when i post a billing document for free goods how can i exclude for a line item (cost element type 1),not to create a profitability segment but only a cost center thanks in advance
How do you configure the gl account for the house bank? : fi- general ledger master data
What are characteristics and value fields?
What is the ESI sheet?and its role in real time
Tell me about the tax reports in sap
Explain an account group. What does it control?
What do you understand by profit center? : cost center accounting
What are the functionalities available in the financial statement version?
what is the form name for use functional spec? what are the steps in functional specs?