can any body tell me what is standard cost estimate with
out quantity structure,and what is the configuration
settings for that?
Answer Posted / john
A cost estimate without qty structure is the KKPAN, its a
manual cost estimate and does not use the work center
routing scenarios that exist with a qty structure.
the config settings, are cost component structure the
costing variant, and possibly the costing sheet if that was
required.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How do you ensure correct balances in the financial statement version? : fi- general ledger accounting
What is the difference between Held, Parked, Recurring and Sample Doc?
How do you go about configuring material ledger?
Differentiate activity-dependent and activity-independent costs? : co- cost center accounting
Explain asset accounting? : fi- asset accounting
Steps to config IT Depreciation
How data flows from co to copa? : co-pa
What is splitting? Explain the splitting structure? : co- cost center accounting
Suppose we have created a PO with qty 100 Ton and we have done MIGO with qty 99 Ton and after that we have MIRO 100 Ton. Interviewer asked me how can we load the difference qty balance of migo and miro (100-99=1ton) on material? please help regards sandeep.
Explain fi-mm integration? : fi- accounts payable
Can we change the Useful life of an Asset? If the depreciation is posted for some years?
What is direct activity allocation? : co- cost center accounting
What is account determination ? : fi- asset accounting
Is it possible to calculate standard cost estimate for a past date?
What do you understand by variance calculation in period end closing? : cost center accounting