Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how can we minimize the off load losses of a distribution
transformer which is required to be energized 24x7 ??
capacity of the T/F is 1250 KVA and off load losses are
around 2.0 KW.. can we use capacitor bank at the secondary
of such a T/F to overcome off load losses? please elaborate
briefly...thanks

Answer Posted / shariff

Distribution transformers are to be charged 24x7 as they
have to supply to the consumers. These transformers are
loaded in a day ( 24 hrs) with different loads, i.e more
load during peak hours and light loads during off peak
hours. Whatever the load or no load on this trf the off
load losses will be present in the trfs and cant be
avoided. The capacitors connecting sec. will not help in
any way and that will be used only for the pf improvement.
Hence this trf efficency will be calculated as ALL-DAY
EFFCICIENCY... For more the the effciency the trf should be
loaded to its rating(100%). The noload (offload) losses
cant be supressed in the transformers as this is part of
the loss occurred to magntize the core.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

tan delta equation test on alternators

2263


Why does amplifier gain reduce?

1102


what is feeder bay?

1651


sir pls send the je exam - 2008 and other model question papers..

2119


If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables

1549


what is the difference betweem star connected motor & delta connected motor?

2410


why only exciting current is shown not primary current in transformer???

1913


How to size fuse? How to size MCB?

1585


hi, i have 3x200KVA and 2 x 80KVA UPS with battery bank of 150AH 68Nos. and 100AH 204Nos., i need to install AC either ductable or PAC type, so can you help me to calculate heat load and capacity of the AC to install.

2784


Is single load(eg: three phase motor) having all the components like positive,negative,zero sequence components during fault condition?

1884


How can we measure earthing resistance test (Earth meggar) of Transformer neutral pit while in live condition?.

2211


List examples of voltage source?

1082


we are small scale industry in production of rice & rice bran. Pls let me know how to take contract demand for our industry.. (for information we have total 600.hp)

4497


Explain how you decide what size of electrical wire do you need?

1188


Why do we need a separate control desk & PLC control panel in Boiler plant or coal handling plant? Can we provide cost effective Control desk cum PLC panel. Is there is an specific need for control desk.. kindly advice.

2429