Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How wti of transformer works?

Answer Posted / dinesh as pritech

Transformer is a static device which is used to transfer the
electrical energy one place to another place without any
changing in frequency.
Transformer works on the principle of mutual induction.

Its consits of two winding is known as primary and secondary.
The magnetic flux moves primary to secondary winding.

Is This Answer Correct ?    2 Yes 22 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between the relay and the circuit breaker?

1109


how can we select the appropriate VCB ?

2296


How we can calculate the Amps for the cable Ex:- For 1sqmm wire how many amps we can draw (calculation)

3178


What is the size of a 60 watt and 80 watt tubelight?

2152


List out the the types of Mounting Light fixture?

1593


HOW TO CHECK THE VECTOR GROUP OF A TRANSFORMER YD11?

3605


If o/p power is doubled by how much does the sound increase

1070


write a program that prints prime numbers from 1-20 in digonal form

1984


all interview questions with answers of ntpc (2000-2009

2201


Write the force balance equation of ideal spring element.

1240


any earth foult trip the relay but in welding time not trip by earth foult

3157


How many turns are there in primary winding? (In Transformer)

1684


Define delay time.

1073


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

2005


what happen if the parallel generator phase angle shift by 1 degree in manual mode

2032