why nutral and earthing wire connect with each other in
main panel board.?

Answer Posted / asad ali

To provide zero potential to the nutral, we connect earth &
nutral together in any of the ckt....
i got this answer but do u think it is good idea??
because as i know in every grid station a meter is
connected with each feeder, so if cct return current is not
coming back to this meter and going inside the earth
through netral to earth link in panel then how this meter
in substation works????

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is meant by stator? What is meant by rotor?

618


why ups rating in kva? and why ups are in parellel?.why isolation transformer is used in ups?

1465


What is the effect on 3phase induction motor if current setting knob of DOL kept at minimum current?

3140


what is PWM in IGBT and how it works for drive.?

1226


state working of halogen lamp?

1351






Is it true online ups having bypass mode if it is true then why we called ups because it is interrupting power when goes in bypass mode

1541


What is voltage divider rule?

697


In AC if the direction of current keeps reversing every half cycle, how does it propogate through the transmission lines?

1632


Explain using drawings what is reverse PID action w.r.t PID controllers.

2745


Proviiding the Dedicated N earth and individual Body Earths ,Finally these all looped /Now my Question :- will it not harm in case of Transformer Fault current flows in Dediacted N Earthing to Looped Body Earthing.

1738


What is the method for testing the differential protection stabilty in generator? When the time of starting What will happen if differentail protection connection wrong means?

1757


What is star-delta transformer?

676


What is the method to solve circuit using source transformation?

654


Type of motor stater detail and working detail

1258


What is a advantage of Self Reset Lockout ? On Fault breaker get trip & fault no longer exist then self reset lockout how inform us?

1370