1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / shinto4real
The ans is 0. Anything multiplied by 0 is 0. It'll only make a difference if it was written with brackets.
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
how to conversation of all construction material in to brass
What are the advantages of cad software?
What is the quantity of cement in mix m20 concrete?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
What things architect have to take care of before starting any project?
what is the permanent solution applied for restoration of leaning tower of pisa?
what are the types of dimensioning?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
at which depth the construction of tunnel is economical from cost and engineering aspect.
why the profile of shell of natural draught cooling tower is hyperabolic.
what is right & short method of measurement of slab&beam
rimmer in pile foundation
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.