Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what do you mean by the "bay" in a switchyard?
how to determine exact number of bays in a substation?

Answer Posted / shibuss

The interconnection of the following equipments forms a Bay
1. Line isolator with e/s and bus isolator
2. Lightning arrestor
3. Potential transformer
4. Current transformer
5. Circuit Breaker and
6. Carrier communication equipments
The following are the type of Bays
1. Incoming feeder bay
2. Outgoing feeder bay and
3. Transformer bay
The number of bays are selected based on the number of
feeders incoming and outgoing and the number of transformers

Is This Answer Correct ?    88 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what exactly commisioning work does in electrical site work... LT side?..

1993


What will happen if we on 200kvr capacitor bank(11kv in bus)If there is low load on transformer (1.5 mva 33/11 kv)

1632


What is kirchoff ’s current law (kcl)?

1139


Why do we need interlocking in a HT metering or Ring main unit switchgear?

2092


What are IR values and what it should be for coil and for insulator

3046


700KW 6.6KV slip ring induction motor to use VFD to control the speed

3263


plz send me the procedure and syllabus for mseb exam

3925


Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.

1647


what is booster? and how it is connected in a circuit?

2695


what is the meaning of WYE and DELTA in Electric meter?

3874


When distance between two pulleys is not fixed, the tension of belt is adjusted by a) driver shaft b) driven shaft c) adjustment screw d) belt

3068


What is the basic principal, by which DC voltage level is increased more than the supplied AC voltage during conversion. As upto AC level it is contorrled by firing anlge but after maximum level how is it possible.Please clear picture. OR we have to supply the higher level AC?

2019


difference between semiconductor & conductor & insulator?

2430


at what rate the micro controller increment its timer....is it 1micro seconds or 1/(12*10^6) seconds

1845


What is the physical significant of power factor?

1980