can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
what is the maximum number of course that can be laid according to IS code and the max height.
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
What you understand by richter scale?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
How to find permissible diagonal tensile stress in reinforced brick work
What are the phases inspections are done by local authority while construction?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
What is the usage of zoom command?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
How do you calculate reinforcement weight of steel?
What is braced excavation all about?
How much quantity of cement,sand,stone used to build 1 cum of cc road??