As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / ramir v. agustin
Do corrective action on areas with non conformance and
ensure quality standards and specifications are
complied.Keep records of the cause of the problem and the
solutions undertaken for future references.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
what is m30 in concrete tiles
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
How and where are aqueducts built?
what is the function of GSB all class ?
acceptance criteria for concrete works
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
What is .Dwg?
What is pre-stressed concrete?
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
how to calculate spacing rod in column
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
what isload waring calculation