As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?

Answer Posted / ramir v. agustin

Do corrective action on areas with non conformance and
ensure quality standards and specifications are
complied.Keep records of the cause of the problem and the
solutions undertaken for future references.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?

5803


how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?

1990


what is m30 in concrete tiles

1882


In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.

3697


How and where are aqueducts built?

667






what is the function of GSB all class ?

662


acceptance criteria for concrete works

1673


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1394


What is .Dwg?

846


What is pre-stressed concrete?

651


Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?

1282


how to calculate spacing rod in column

1416


find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

1796


If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in

1580


what isload waring calculation

1880