1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / sudipta
15
| Is This Answer Correct ? | 6 Yes | 17 No |
Post New Answer View All Answers
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
how to caluclate sienerge qty in construction in ap
What is the cost difference between site mix and ready mix concrete per cubic meter
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Describe the advantages and disadvantages of using plastic and timber fenders?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
What is the difference between EPC,DBOOT and BOOT.
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
how meny typs of renging rod?
how much to get of BRC lapping in full yield and half yield ?
what is a well
Will water damage concrete?
What is the difference between engineering stress and true stress?
How many mortar required for Brickwork of 1 Cu.m works??
what is anchorage length,lap length and (dont remember the last one)