what is the difference between incompleate order and
backorder processing?

Answer Posted / shriyasuhaas

Incomplete proccedure is used to determine if the
document is in complete then based on the status how should
the system behave .

Should the system throw an error ; or the system should
not allow the trsaction to complete or the system should
allow the trasaction to compelte the document but throw
the warning message

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between transaction data and master data?

577


Explain what copy control is and when copy control transition can be done? In what manner copy control transition can be done?

667


What is the difference between make-to-order production with and without assembly processing?

715


what is the purpose of sales document types/

1527


What are the challenging issues you have faced in implementation project/Maintenance project in SD Functionality? How you have overcome that issue???

1850






Do you have any link for customer master and credit management?

644


How is credit control determined in sap?

646


Who defines the account groups and give some tables in sap sd for customer master?

762


wat is core team. wat core team member do plz answer asap thnks

5882


What does billing support mean and what are the effects of billing on the system?

615


What is the standard group condition routine in condition type, what is its importance?

644


What is third party order process?

665


Name at least five features that you can control for the item category?

603


Do you know what is made to order scenario or make-to-stock scenario? SO, in the make-to-order scenario, what’s the integration touchpoint that you figure MRP? My question is when you have a make-to-order scenario, how does MRP will be figured? How system know that when you create a sale order whether the sale order is calling for make to order or make to the stock type of order, which data determined this is made to order make to stock…. The system should understand when I create an order, whether it’s made to order or make to stock, so which parameter which value that system will be determined based on that system will say okay this make to order so I need to I mean the system has to go to the next level then it’s going to the MRP all the subsequent planning will be taken taking place, what’s the parameter that we have to check?

396


TELL ME FIVE REPORTS, VA05 TELL THE FIELD SELECTIONS

1780