Answer Posted / slicer
type of diode: 1.diode,zener diode,tunel diode,shockly
diode,varactor diode, triac diode,diac diode,L.E.D diode,SCR
diode,BJT diode,FET diode and Mosfet diode.
Diode symbol: K- stand for CATHODE, A- stand for ANODE.
Diode is like a converter, if your current input is AC the
result output is DC. if your current input is DC the result
output is AC.
Is This Answer Correct ? | 5 Yes | 8 No |
Post New Answer View All Answers
There is a safe with a 5 digit number as the key. The 4th digit is 4 greater than second digit, while 3rd digit is 3 less than 2nd digit. The 1st digit is thrice the last digit. There are 3 pairs whose sum is 11. Find the number.
there are 3 nurses and they work altogether only once in a week. no nurse is called to work for 3 consecutive days. nurse 1 is off on tueseday,thursday and sunday. nurse 2 is off on saturday. nurse 3 is off on thursday, sunday. no two nurses are off more than once a week. find the day on which all the 3 nurses were on work.
8 persons A,B,C,D,E,F,G,H are sitting in a round dining table.some arrangement was given and position of H was asked.I don't remember the question exactly.
hai frnds pls give me some tips and traps about HP software company interview for freshers.am a B.E CSE fresher.hoe will be the interview?how many days it will be conducted?how will be apps round?technical round?hr round?pls help me if any one known means.send me that pattern by vijay ,chennai
If the letters of the word "rachit" are arranged in all possible ways and these words are written out as in a dictionary, what is the rank of the word "rachit".
Seema's weight is 25% of Sunita's weight and 40% of Tanisha's weight. What percentage of Tanisha's weight is Sunita's weight?
If it takes 10 technicians working 6 hours to build a server. They start woring at 11 AM and 1 technician is added per hour starting at 5 PM. At what time they will finish the server?
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
Each row of letters or numbers has a rule connecting them. Write the next number or letterin the brackets. 124 , 62 , 60 , 30 , 28 , 14 , (_ _ _)
Starting from point A, Jayant walked 15m towards west. He turned left and walked 20 m. He then turned left and walked 15m. After this he turned right and walked 12m. in which direction is Jayant from X and how far has he walked from point X?
FIND the next number in the series 11,112,1124,11248,--
The population of a city increases @ 4% p.a. There is an additional annual increase of 4% of the population due to the influx of job seekers, find the % increase in population after 2 years ?
three clocks where set to true time .First run with the exact time ..second slows one minute/day. third gains one minute/day. after how many days they will show true time.
If 20 men take 15 days to to complete a job, in how many days can 25 men finish that work?
a man buy a liquid by 12 lts and the mixture is of 20% liquid in water then he makes it in 30% mixture then what is the % of liquid with water.