deshuttering time for RCC for DPC over the foundation.
Answer Posted / vignesh s
For beam and slab
side deshuttering-
1 Day, slab bottom-
10Days, beam
bottom- 14Days,
cantilever beam
bottom- 16 Days
above days will be
followed after
completing the rcc
slab.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
Trapezoidal section footing calculation of Volume & its Area
Which prize is the alternative to the NOVEL Prize?
to minimize budget cost of building , what can i do
Define What is the difference between routing maintenance and major maintenance in school facilities?
States some of the commonly used commands in cad software’s?
The portion of a brick cut across the width is called?
Design a rectangular channel.
what is c4x light weight cement blocks
How to fix toll charge for a particular vehicle at toll booths in a highway?
which has high compressive strength between hollow block and brick masonry?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
Define the various stages of the project planning process in construction.
What is the snap size in civil and how can we create it?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
What is the tensile strength of wood?