Tell the details of the precommissioning tests that are
performed on distribution transformer, power cable and
switchgear (11kv).
Answer Posted / subaharan
first check the transformer bushings and their condition,then
you meggering the transformer each phase to phase and phase to
earth.
power cable you check the high voltage test which is used for
measuring the leakage current,meggering and continuity
checking.
switchgear the same meggering,isolator checking,relay
testing(set various values of currents,voltages and set time
for tripping) make the fault and note the trip time.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
i have a 1500kVA transformer what is the kWH meter i need to use?
On Which Pressure PRV is operated.
Bimetal strip used in overload relay what is that,which types of material used for that & percentage.
Define resonant peak?
I have 1500/1A CT If i connect this CT in 6.6KV bus bar means what will be the voltage present in CT?
What is genrally the % Impedance of a Dg set? How can we calculate Earthing conductor size for a DG set?
what kvrah y we need to take the readind of that
Please tell me the power flow from pmg to main rotor of an alternator (Including AVR unit)?
HOW can i REuse the fused MLL LAMPS & GLS LAMPS at our factory
What is Phase to Phase clearance for 800V System Operating Voltage as per IEC61439
what is the current density of copper & alluminium.
What are the components of feedback control system?
Which types of gate insttaled in static switch. Please give me answer.
what do w do when the output of generator is fluctuating?
what r the checklist while installing a 380 kva DG set