Answer Posted / sanjay s. karpe
The meaning of the Grade of concrete is charactorstic
compressive srenth of the 150mmx150mmx150mm concre cube at
28 days age
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
How to calculate carrying capacity of the existing water supply trunkmain
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
Explain major differences between routing maintenance and major maintenance.
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
i want texture painting pwd data
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
What is a kip?
Scaffolding IS code NO.
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
what is diversion?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure