Answer Posted / anup sharma
Old roof nd new roof are joined using hilty.
Hilty is the process in which a hole is made in the older
roof by drilling and hilty chemical is inserted inside the
holes and finally new reinforcement is inserted inside these
holes such that the older and the newer reinforcement stay
connected. after that form work is done and the new roof is
casted.
Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
Floor tile measurement? Wall to wall or skirting to skirting
Define What is the tensile strength of wood?
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
Define block?
What are the alternate material for steel, Sand and aggregate
How many types bend used in civil reinforcing
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
What are segregation and bleeding?
how much required strength of cement concrete bricks(size 230x115x75mm)
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
Explain the different types of roofing systems?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam