WHERE IS THE LIGHTING ARRESTER SHOULD BE PLACED IN
DISTRIBUTION LINES?
Answer Posted / vino raju
LA is mainly protect the substation equipment from high
impedemce voltage and also the first equipment inthe
substation is LA
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
An 8 pole, 50 Hz, 3-phase IM is loaded to a poing where pull out torque will occur. The rotor resistance per phase is 0.3 ohm and motor stalls at 650 rpm. The slip when motor stalls is A 1 B 0 C 13.33% D 10.33%
how to Select its CORE in electrical cables based on its applications? or Application of various types of electrical cable based on it CORE?
If the rated speed of a d.c. Shunt motor is1440 r.p.m, which method of speed control would you suggested to obtain a speed of 1500 r.p.m?
What are the types of windings present in the ceiling fan? What winding will be effective first when we started the fan?What are the resistance and inductance ratios comparatively at the initial speed and full speed of the fan?
i have 90kw motor.so i choose connect cable .please what is parameter checked so please give to formula
what is power factor ? how we can calculate the low power factor and amount of capacitor for improve that low factor ?
Is there possible to Test Transformer for Overfluxing Capability. Or is there any firm who does Overfluxing Test on Transformer?
how to calculate the size of the HT cable
why the projects getting loss?
electrical
it is possible to measurement of tension of slipring induction motor(SRIM)carbon brushes, any maesuring instruments are available in the markets.
while doing high potential for 11KV 3 core cable how much leakage current will obtain?, what will be acceptance value?
what is the difference between Power and Distribution transformers ?
where is the need for short circuit test for 3 see is required and why? can you explain in brief with application
How does the phase sequence controller works, how it identifies the phases? confirm working principle