Answer Posted / shaikh moyunuddin
concrete strength process timing is 1 year
after 28 days concrete gets 90% strength
then
for - M15=1:2:4=15+1.5=16.5 n/mm^2
for - M20=1:1.5:3=20+2=22 n/mm^2
for - M25=1:1:2=25+2.5=27.5 n/mm^2
& above the m25 grade,that is Based on design mix per IS.
for find strength of above m25 grade strength=concrete strength after 28 days+10%strength of concrete getting strength after 28 days
getting m45 grade strength laboratry test used
ther generally cement ratio increased & test & test till geting m45 strength
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
Why does the pressure increase under soil?
what is a well
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
How to do base isolation for RC framed structure using ETABS software?
What is the l/d ratio of cantilever beam?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
What is the different type of slump test indications?
what is the most suitable foundation when construct a bird watching tower in a marshy land
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
what is the list of building construction equipment & teir output?
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
what is the mix design for M:60 with micro silica andmetakaoline?
What are the uses of layer?
Scaffolding IS code NO.