concrete strength process timing is 1 year
after 28 days concrete gets 90% strength
then
for - M15=1:2:4=15+1.5=16.5 n/mm^2
for - M20=1:1.5:3=20+2=22 n/mm^2
for - M25=1:1:2=25+2.5=27.5 n/mm^2
& above the m25 grade,that is Based on design mix per IS.
for find strength of above m25 grade strength=concrete strength after 28 days+10%strength of concrete getting strength after 28 days
getting m45 grade strength laboratry test used
ther generally cement ratio increased & test & test till geting m45 strength
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
How will you reduce the concrete flow after mixing the concrete
what is the difference between tsp & tower
what is stressing
What materials were used to build the golden gate bridge?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
In reclamation works what are the importance of geotextiles and sand?
How and where are aqueducts built?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
what is idealized curve for concrere and steel
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
is basic cost of the material includes tax?
what pressure the NP2 class RCC pipe can sustain?
2nd and 4rt angle elevation used in which country ?
Why do you want to work here