Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the strength [final]of grade m 15 to m 45

Answer Posted / shaikh moyunuddin

concrete strength process timing is 1 year
after 28 days concrete gets 90% strength
then
for - M15=1:2:4=15+1.5=16.5 n/mm^2
for - M20=1:1.5:3=20+2=22 n/mm^2
for - M25=1:1:2=25+2.5=27.5 n/mm^2

& above the m25 grade,that is Based on design mix per IS.
for find strength of above m25 grade strength=concrete strength after 28 days+10%strength of concrete getting strength after 28 days


getting m45 grade strength laboratry test used
ther generally cement ratio increased & test & test till geting m45 strength

Is This Answer Correct ?    5 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How will you reduce the concrete flow after mixing the concrete

2238


what is the difference between tsp & tower

2528


what is stressing

6774


What materials were used to build the golden gate bridge?

1363


pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width

1626


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

1318


In reclamation works what are the importance of geotextiles and sand?

1192


How and where are aqueducts built?

1251


how to convert cement, sand aggregate quantity from M3 to kg with full description?

2179


what is idealized curve for concrere and steel

2368


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

2028


is basic cost of the material includes tax?

2177


what pressure the NP2 class RCC pipe can sustain?

2749


2nd and 4rt angle elevation used in which country ?

2315


Why do you want to work here

2428