Answer Posted / paresh
PLC STANDS FOR PROGRAMMABLE LOGIC CONTROL.SO ITS PROGRAMMABLE
LOGIC CONTROL COMMUNICATION
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What is the cascade control
I want to apply for the universities in US,but i got the GRE score of (650+300=950)TOEFL 69/120.Is this score sufficient for applying universities please i am married i need to go to US because my husband didn't get H1 yet.please send me suggestion
What is PDS and PDMS ?
1)How many tpes of vibration probe and how many tpyes of vibration. 2)how we can calibrate a vibration probe with tk3 3)what is RMS value in vibration measuring application and how we calculate it.
can anyone guide me how to get any of the previous year GAIL question papers? are they available? 0n 2nd august i have to take the written test.
How u will setup SPI(2007) on Citrix Server (Thin Client Mode)? Plz Justify?
Whether the DI, DOs shields can be connected with Analog Input Shield Earthpit?
Questions on flow meters,few questions on HART protocol,
Explain why plc require in analog input 4-20amp & 0-10 volt?
explain key exchanges in all security modes WPA,WPA2,TLS?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
Pressure tx shows 1 mbar but we need 1000 mbar at this process condition .. how can we sort it out .
We are using Rosemount 5400 series Radar Level Transmitters in all types of Sump Applications having oily water hdrocarbon petrochemical nature. What we are facing the problem frequently is that always getting reading frezzed at some value. If we do power recycling , sometimes it is working . then making same freezing problem. If anybody faced before such type of problem and also having solution , Please give the answer.
How r the calculation of process line mpm.
why using negative supply for bentley nevada vibration system ?