Answer Posted / nitish bajaj
M-5,M-7.5,M-10,M-15 THESE GRADES ARE USED IN
ORDINARY BUILDINGS
For RCC Concrete = M-20,M-25,M-30,M-35
For Coloumn, Pier etc = M-40,M-45,M-50,M-55
For High Grade of Concrete = M-60,M-70,M-75,M-80,M-90,M-100
Is This Answer Correct ? | 13 Yes | 4 No |
Post New Answer View All Answers
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
what is the most suitable foundation when construct a bird watching tower in a marshy land
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Aptitude, reasoning, quants, verbal and technical question
What is the average density of soil?
Will going from a 3-tap to 6-tap increase water pressure?
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
What is rate of concrete surface rendering work per sqm
What is the difference between linear dimension and aligned dimension?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
Basic questions of civil engineering
how much to get of BRC lapping in full yield and half yield ?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
Explain soil analysis?