What is meant by 'zero value' in quantity surveying.
Answer Posted / sudheer
Zero value is BOQ cost. It will be compared with actual or
executed cost. Which show the extra cost for for
construction.
| Is This Answer Correct ? | 10 Yes | 9 No |
Post New Answer View All Answers
how to nfind out the specific gravity of sand.aggregate,water please help...
What are wooden shingles?
How did street originate in the plumbing term street ell?
how many cement used in single story residential building per sqft
HOw much % of premium on DSR-2013 currently
What are the skills required to become an architect?
Detection of a beam & a girder areββββ
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
mix design procedure for 1:6 cement mortar
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
roll of DLC in road constructions
how many time use of plywood shuttering and IS code
What is an ice dam sock?
Explain what is 1/8 on the architect ruler denotes?
what is pouring and explain