When the RCC was developed in the early mid twentieth
century, the quality of each input was taken into account
based of the cost of inputs and the quality of our
integrity at that time.
With passage of time the quality of inputs have gone down,
One because of poor integrity of each of us contributing
into it be it the material manufacturer or the worker at
the workmanship stage.
and
Two because the cost of each thing be it labour or
material, has gone up substantially, compelling the
manufacturers and material suppliers to supply material at
competent rates, thereby prompting them to compromise in
quality.
Also while the factor of safety taken into account at time
was 3 X 3 times with plain mild steel, now with torsteel it
has been brought down presuming that the structures are
never stressed to that extent.
I believe, if we we are able to correct our mentality and
if the buyer agrees to pay the hike in the cost towards
improving the material quality and the workmanship, the
life will be atleast 80% of the stipulated life of 100
years.
| Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
What is M40 _ TOR - EQ and B.F.S
what is the name of shuttering oil used in oman
what is w/c ratio in dry lean concrete for m10 mix design
What black man invented the clothes dryer?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
how to calculate the weight of concrete
The largest size of paper used in plotter to print the drawing made by Autocad .
Define mirror?
what is the formula for Mass of cement grout (Dg)=???
please briefly explain calculating or estimating steel quantity for a RCC column?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
WHAT IS YOUR EXPECTED SALARY?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
What are the advantages of cad software?