Answer Posted / bhatt
MCC is motor control centre hence it must have back-up fuse
or back-up MCCB/MCB and starter whereas PDB is Pwer DB
which generally feed lighting and normal power load.
| Is This Answer Correct ? | 14 Yes | 2 No |
Post New Answer View All Answers
IF ANYONE HAVE ANY QUESTION ASK ME AT MY MAIL anmol.bhardwaj5@gmail.com
sir pls send the je exam - 2008 and other model question papers..
Is there a standard depth of gravel fill in Substation Switchyard? Please give a design/drawing. Thank you.
Please nybody say, weather the result of Bharat Oman is declared or not? Probable date of declare???????
PLZ sent the previous year question paper for GET in NHPC on my EMail id ppshanker@gmail.com
please send 5yearje solved papers on my email himmatsinghnathawat@gmail.com
Please send 110 kv sb station full single line drawing(sld)
hi this is hema, r there any books in particular for the preparation of the APPSC-A.E.E(electrical), if so please mail me the names ... thank u .
What is the basic principal, by which DC voltage level is increased more than the supplied AC voltage during conversion. As upto AC level it is contorrled by firing anlge but after maximum level how is it possible.Please clear picture. OR we have to supply the higher level AC?
Define the overload capacity of the motor?
what is meant by IGBT how they differ from tyristor ?
RESPECCTED SIR/MADAM- I AM PRERING FOR SECTION ENGINEER (ELECTRICAL) RRB CHANDIGARH PLEASE SEND ME SOME PREVIOUS YEAR QUESTION PAPER OR MODEL PAPER.MY EXAM IS ON (30- NOVEMBER 2008).I AM VERY THANKFUL TO YOU. FROM- HARENDRA SINGH YADAV
what is the condition for YnD11
What current position are you holding in your current company?
hi plz send me reliance placement papers..i.e electrical technical papers that have been asked in reliance test.