for 100sft of Cement plastering ratio 1:6 How much quantity
of cement and sand required.
Answer Posted / mohammed aijaz hussain
Let the thickness of Plastering be 12 mm.
Volume of Wet Mortar = 12mm X 100 sft.
= 12/ 1000 X 100/ 10.76
= 0.112 cu.m.
Add 20% for depressions, joints and wastage:
= 0.022 + 0112 = 0.134 cu.m.
Volume of Dry Mortar = 1.3 X 0.134 = 0.175 cu.m.
Cement required = 1/7 X 0.175 = 0.025 cu.m. = 0.71 Bag
Sand required = 6/7 X 0.175 = 0.15 cu.m.
| Is This Answer Correct ? | 41 Yes | 21 No |
Post New Answer View All Answers
How do you compute the volume of airflow?
what is stressing
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
In the roof of a pumping station explain briefly the components of a waterproofing system?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
what is detail procedure of eccentric footing? plz. give solved exmple?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
What is absolute coordinates?
What are the composition of a landfill?
The portion of a brick cut across the width is called?
What is the origin of name railway sleepers?
Who built the sears tower?
how to caluclate sienerge qty in construction in ap
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand