Answer Posted / gaurav
Make "V" groove and then pre heating of the job is required
and proceed with welding. After welding RT is done and then
SR.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is stellite ?
What is the difference between Maintenance Order and Production Order. the point is i want to know the affection of Movement type 261 thru maintenance order and Production order. if i change any settings for Maintenance order it will affect to production order process also for 261 movement type ?
Sir, I need help. I have completed dip. mech engg was working in facilties management ((Dept) for +2 yrs) in real estate, now I want to join in for mechanical industries please suggest me which should I opt for?
In which process internal energy remains constant ?
Is the unit and normal value fuel ratio of an average diesel engine?
What is the use of flash chamber in a vapour compression refrigeration cycle to improve the cop of refrigeration cycle ?
What do you mean by cotter joint?
Explain the difference between “stress and strain”?
What is the effect of high alkaline water to a boiler?
Dear Friends I want to previous 5-10 years technical and non tech. question paper of section engineer (mechanical)of RRB and also tell me how should I prepare for S.E. and which books will help me for technical,aptitude,resoning.plz send me at bkcs.bkcs@rediffmail.com
Can metal vapour converted to solid metal
hi this is swaroop i appliled for masters in us for mba and my ielts score is 5.5 and no gre and i have 14 backlogs
What valves are fitted in a four-stroke diesel engine?
What is the difference between basic hole and basic shaft ?
How to stoped water tube boiler