Answer Posted / shailesh
CTC MEANS COST TO COMPANY,THIS INCLUED LABOUR,MATERIAL,AND
DIRECT EXPENSES.
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
write the algorithm for false position method?
what was the age limit for group2 exams for reservation candidates?
dear, sir plz tell me abt that what is the syllabus of postal assistant/sorting assistant written exam conducted in madhya pradesh.
How we can connect to Technology
i am now attendind degree so can anybody say me what conbination helps to attempt KAS
I want know some good coaching classes in Mumbai for drug inspector exam. Please do reply quick.
it in 1 to 6 ,it is 15 to 20,it is 5,it never be 21 until it flies,what is it?
i want previous question papers of juniour lectutrs for physics subject.
what is public borrowings
what would be the cut off for general candidate ,in the cabinet secretariat recruitment exam held on 16 th june,2013,tier 1. after how much time do they generally declare the tier 1 results
Why CO2 Peak is coming in IR Spectr
In which ocean is a lake
Dear friends any body can tell where i will get Degree lecturer chemistry study materials.
kindly tell me about the preparation of bank p.o?
why did the British decide to give education to indians