What is the acceptance value of leakage current in HI POT test
Answer Posted / tharindu eroshan henadawithara
3 mA for 11 kv for my sites,and really it is possible in 3c240 xlpe/pilc joints(new ,short distance).
3c240 pilc possible with 8mA max(length and old)
dry country with under ground system.
no rain at all..(no effects from water,but may from see)
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What is cross over distortion? How it can be eliminated?
what is saturation kit?which use above 15 kw motors panel side.
how is working bearing heater?
whats the existence of reactive power and when it arises?
I WANT HOW CALCULATE TO CABLE FOR WELDING PLANT ?
what is a bus post insulator? explain its application in a substation.
Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18
Why an ac systems are preferred over dc systems?
if grounding is notdone at regular intervals for long distance transmission, will the load connected at distribution end receive voltage during negativehalf cycle of the sine wave?
IF TVM OF TRANSFORMER SHOWS POWER FACTOR ON 33 KV SIDE AS 0.97 LAGGING AND ON 132 KV SIDE IS 0.75 LEADING.IS THIS CORRECT.WHERE IS PROBLEM.
Thermal withstand capability under full short circuit conditions, in terms of number of times of occurrence of short circuit and corresponding anticipated percentage reduction in transformer life.
What is synchro?
What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side
magnetizer priciple
What are the different types of controllers?