Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why using 4-20ma not using 0-20or why not using 1-
20ma???????

Answer Posted / nilesh

This is a universal standard adopted.4 mA at 0% ensure live
zero.

Is This Answer Correct ?    5 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is hp & mp seperator .& what is its working principle ?

2634


Q- What are the application in which PNP transistor is preferred over NPN ?

3348


how u calibrate pneumatic n motorized c/v?

1974


Please any one can provide latest aptitude test,technical test and interview questions for tata consulting engineering (TCE) i need it asap thanks in advance

2034


Turbidity analyzer working principle ?

1788


Explain the use of hair spring in the pressure gauge.

1094


May I have a brief note above the voltage barriers? Whats is the purpose? Please mail me if you've operational details, mail id: rajkumar.diice@gmail.com

2139


How we can check the 2 wire proxy switch? & how it is connected to DI MODULE OF PLC?

2606


How to control flow variations in magnetic flow maters..... When i will provide proper earthing?

2323


POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?

2296


Im having problems with interfase betwen SPI v7.0 and SPPID v5.05. Previous versions of Intools shoul be fixed with SPPIDproj.ocx file. It was necessary to replace this file with one that allows the connection between different versions of SPPID. It is necessary in the current version to do the same?Thanks

2312


sir,would you please send me the Hindustan petroleum corporation limited papers(HPCL).my e-mail ID is ujjwal_sharma1983@yahoo.com

2329


Valve positioner and actuators in detail.

1794


Explain the burnout feature.

980


Specify eight technical requirements that you would consider important, when deciding upon a particular control valve?

1893