Describe the basis on which alarms should be generated and how
their associated priority is determined
Answer Posted / vinod hepat
Alarm should be generated for all the values which distrub
you process & alarm should be set at such a value that
operator get time to take corrective action.
alarm which hamper ur process,safety or equipment badly
should be given high priority.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to rectify the poor signal strength in utrasonic digtial flow meter ,model:ge digital xce868i
how works encoder in plc
Give an example where you had aproblem on the job, and tell me how you solved the problem. and the finalvoutcome.
I was working on calibrating turbidity transmitters endress+hauser at effluent polishing plant.We calibrated using NTU buffers.What happened is that when we immersed the sensor, everytime we raise and lower the sensor gradually, the reading will vary.my question is that is there any specifications on what is the required distance from the bottom of the container with buffer to the face of the sensor?Is it ok to install the sensor in a medium which has turbulence specially if bubbles are present?
i want to find out iffco get test paper
How to work togather like sov,limit switch,proxy switch and booster in xv
key exchanges in wpa,wpa2,tls
where i can get training in INTOOLS and PDMS in Delhi-NCR OR north part of India. please reply with ur ans. at arunsamkaria@ymail.com
how pressure transmitter work, what is its principal to measure and how its generate signal. for pressure transmitterinstallation which precautions must be taken ??
How process line mpm calculation is done?
Why MUX JB's are using only Temperature Element in Fundation field bus?
Which type of diaphragm use in costic line, dm water line, natural gas line, oil line?
Give Detail information about plc,dcs,and scada system?
How can i copy program (parameter) from mm440 (V.F.D.) by using BOP?
how to calculate orifice sizing? and tell me if pipe size bet 50mm t0 200mm then we can use pipe flange??? and above 250mm pipe size should i use D & D/2 Flange? is it right or wrong?