Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why neutral and earth should not be connected on 3 phase
440v/50c/s supply at consumer side. where as on
25kv/ac/50c/s railway traction substation neutral and earth
will be connected and track at substation. and track will
act as neutral and earth. Reasons for this is needed
urgently

Answer Posted / shivababa_1812

electrical engineering

Is This Answer Correct ?    1 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Do you know what is dry-out test in x'mer

2594


Is there any standard guidelines/Criteria to design NGR/NGT.?

2788


Why have to use copper cable for local isolator to motor ?

2042


How vfd saving power.

1976


what happens to the supply voltage if there is any change in frequency?

6343


In ACS 1000 drive we are using 12 pulse converter,why don't use 3 pulse converter.

1972


how balanced in star delta connection ?

2040


why a tester wont shock while testing the power in house

1793


what topics we have to concentrate for power grid et.written test.and tell what to read for english synonyms and antonyms.

1892


size of condotory fron voltage level

2163


What is the disadvantage in proportional controller?

1097


what is the working process of over & under voltage relay.

2175


Why in power plant projects we see DOL starting method used for motors upto 160 kW instead of star delta method

1778


How do i perform grounding of star point of Genset (400V) for making connection with step up transformer of DELTA-DELTA (400V to 20KV) ? while Genset itself has its own neutral and grounding bus bar inside genset breaker box whereas we have another neutral and grounding busbar in synchronizing panel next to genset at maximum distance of 6meter, would someone pls advice if we can only perform neutral grounding in synchronizing panel or should we ground neutral on both places inside genset breaker box and synchronizing panel.

1702


What is the alternate solution for testing of polarity by using polarity tester while its milli ammeter does not works?

1935