28. A and B can finish a piece of work in 20 days .B and C
in 30 days and C and A in 40 days.
In how many days will A alone finish the job
(a) 48
(b) 34 2/7
(c) 44
(d) 45
Answer Posted / bavani
48
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Imagine 4 persons A,B,C,D.(It is a strength determining game). A found it hard,but could pull 'c' and 'd' to his side. AC and BD pairs on opposite sides found themselves equally balanced. When A and B exchanged their positions to form pairs AD and BC ,BC pair could win and pull AD to their side.Order the 4 persons in Ascending order according to their strengths.
The age of the grand father is the sum of his three grandsons.The second is 2 year younger than first one and the third one is 2 year younger than the second one. Then what will be the age of the grandfather?
a circular track has 100yards. The race of Rabbit and TOuttoise. they started at same point. and move in circular path. in opposite direction.first tortoise run for 1/8 th path, then only rabbit starts,rabbit moved slowly till tortoise meet him, Rabbit had covered 1/6 th distance speed( over earlier speed) to win
If the product of three consecutive int is 210,then sum of the two smaller ints is:
Find the missing word(...),ayw,gec,mki,sqo
If x,y,z are three consecutive natural numbers, which of the following numbers should be x+y+z
sir , i hv done 85 correct question in ssc cgl-tier-i 2010 after checking through my source which is correct , tell me whether i m eleigible for tier-ii or not charan , jalandhar
Find the next series: AC CG GO OE ?
Ajay can build a house in 16 days and Barry can do the same job in 12 days. With help of Chintu, they did the job in 4 days only. How many days Chintu can do the job?
A student is ranked 13th from right and 8th from left. How many students are there in totality ?
There are two natural numbers. A cube difference of the squares is a square difference of their cubes.These are the smallest possible numbers. what is the sum of these numbers?
10 : 4 seconds :: ? : 6 minutes
A train blows a siren one hour after starting from the station. After that it travels at 3/5th of its speed it reaches the next station 2 hours behind schedule. If it had a problem 50 miles farther from the previous case,it would have reached 40 minutes sooner. Find the distance between the two stations .
In a class of 60 students, a student of weight 45 Kg leaves the class. The average weight of the class is then increased by 200 gms. What is the average weight of the remaining 59 students in the class?
Find the unit digit of product of the prime number up to 50 ?