Quick setting cement's setting time?
Answer Posted / siva
initial setting time of quick setting cement is 5 minutes... and final setting time of cement is 30 minutes
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
What are the uses of alloys in daily life and how are alloys made?
What is the distance between railway tracks?
how to calculate mivan shuttering matrial
Which is the direction for positive angle?
What is chemical composion test
What is difference between combin footing & rapt footing
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
is basic cost of the material includes tax?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
What is the difference between tor steel and tmt steel?
Name the main components of a cad gui?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
How much percentage of brick bats allowed in CD-75 bricks
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)