insequential file 2header avaliable,and 100 records
avaliable.how to skip the 2 headers and load 100 records
target?
Answer Posted / sirisha
tail +2
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
How to create a file using vi editor? 2)how to delete a file in vi editor? 3)How to connect the server datastage to unix? what r the command lines we r using? 4)30 jobs r runnig in unix i want to find out my job. how to do this? give me command?
What are the enhancements made in datastage 7.5 compare with 7.0?
Enlist various types of routines in datastage.
What are the features of datastage flow designer?
how to achieve this output ? Two Input columns(ID & Name) - ID | Name 1 | Jack 1 | Kara In output there should be only 1 column which will be populated as - 1,Jack 1,Kara
Have you used Unstructured data?
Is it possible to implement parallelism in Mainframe Jobs ? If Yes how ? If no why ?
What is the difference between the local container and shared container?
what is the use of skid in reporting?
What are system variables and sequencers in datastage
Define ds designer?
How many types of views are there in a datastage director?
what is the use of surogate key in datastage
What is the difference between datastage and datastage tx?
What is orabulk stage?