Quick setting cement's setting time?
Answer Posted / nikhil chaudhary
5 minutes initial and 30 min final setting time
| Is This Answer Correct ? | 37 Yes | 17 No |
Post New Answer View All Answers
Use of coping on terrace wall and in 4" wall is compulsory or not ?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
What are the advantages and disadvantages of lead products in construction?
What do we mean by partial moment release ??
what is the coefficient for running feet to cft coversion both area and price
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
What is the sugested procedure of water purification for public supply?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
For what building Built-on balconies are preferable? What are the advantages?