how to calculate the required qantities of cement, Sand and
aggrigate to prepare 1 Cum of concrete mix 1:2:4
Answer Posted / vikas patil
For 1 Cu.m Concrete (1:2:4)
Cement =1.52/(1+2+4)=.217 Cu.m=.217/.035=6.2 Bags
Sand=(1.52*2)/7=0.434 Cu.m
Agg.=(1.52*4)/7=.86 Cu.m
out of 0.86Cu.m of Agg use following Proportion of Agg.
20mm Agg=0.65*.86=.56 Cu.m(65%of 0.86Cum)
&
10mm Agg=0.35*.86=0.3 Cu.m(35%of 0.86Cu.m)
Summary=>
Cement=6.2 Bags,
Sand=0.434 Cu.m,
20mm Agg=0.56Cu.m,
10mm Agg.=0.30Cu.m
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What is the cost difference between site mix and ready mix concrete per cubic meter
Which is the latest version of solidsworks?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
Explain what are the phases inspections are done by local authority while construction?
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
How many cum of 9.5mm stone in 1 ton ?
what is kribs is supporting?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
what is Bearing Capacity,How to determine it?
What is the difference between engineering stress and true stress?
Test procedure of fly ash bricks as per code ?
Why we provide hair pin for shed